Aqualia
Project: Supply, Manufacturing , Delivery and Erection of 14 sand filters for Djerba desalination plant -Tunisia (Ø: 4 m; length: 24 m)
Main Contractor: Aqualia
Owner: SONEDE
Year: 2015-2016
Project: Supply, Manufacturing , Delivery and Erection of 14 sand filters for Djerba desalination plant -Tunisia (Ø: 4 m; length: 24 m)
Main Contractor: Aqualia
Owner: SONEDE
Year: 2015-2016
Project: Supply and manufacturing of 02 Static Filter for Ghana
Main Contractor: AAF
Owner: GE
Year: 2015
Project: Supply and pefabrication Piping (25 000 “ ) with Paratino for power plant Sousse D
Main Contractor: Ansaldo Energia
Owner: Steg (Tunisia)
Year: 2014
Avenue Mohamed Hedi Khefacha – 3000 Sfax – TUNISIA
Phone: (+216) 74 101 100 – 74 498 162
Fax : (+216) 74 497 726 – 74 497 438
E-mail: marketing@socomenin.com.tn
industrial@socomenin.com.tn
E-mail: filiale-algerie@socomenin.com.tn
E-mail: tripoli@socomenin.com.tn
Project: Technical assistance and maintenance of steel structure of the direct reduction plant at LISCO’ complex
Main contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2006
Project: Maintenance & replacement of reformer tube
Main Contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2004
Project: Maintenance of over Head cranes at LISCO
Main Contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2005
Project: Fabrication of Twin Deck Topside structure for Halk El Menzel Offshore Oilfield – Hammamet Tunisia.
Main Contractor: Topic
Owner: SAROST (TUNISIA )
Year: 2014 – 2015
Project: Supply of HP, LP, & Cryogenic Tandem Flare System for the Nawara Development Project – GTP in Gabes
Main Contractor: AEREON
Owner: ETAP & OMV (Tunisia )
Year: 2016
Project: Engineering , Supply & Manufacturing of 01 Pig Launcher Skid and 01 Pig Receiver Skid .
Main Contractor: SITEP (Tunisia )
Owner: SITEP (Tunisia )
Year: 2013
Project: Supply of Pig Traps ( 10 Pig Launcher & Pig Receiver ) for Nawara Project
Main Contractor: GIE Bouchamaoui & STREICKER
Owner: OMV
Year: 2016
Project: Engineering, Fabrication of roller tables and pushers for CCM1, CCM2
Main contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2006
Project: SMS1- Installation of Hydraulic type Turn over Cooling Bed (TOCB)
Main contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2006
Project: Supply and Fabrication of one Stack with 06 sections for Cement Plant in Liban.
Main contractor: PA Technologies (Libanon)
Owner: SOCOMENIN
Year: 2011- 2012