EPPM
Project: Design, Supply, Fabrication & Delivery of 14 sand filters( L: 24.5m, Ø:4m) for Sousse Seawater Desalination Plant
Main Contractor: EPPM
Owner: SONEDE (TUNISIA)
Year: 2019-2020
Project: Design, Supply, Fabrication & Delivery of 14 sand filters( L: 24.5m, Ø:4m) for Sousse Seawater Desalination Plant
Main Contractor: EPPM
Owner: SONEDE (TUNISIA)
Year: 2019-2020
Project: Supply , fabrication and Delivery of 10 Pressure Vessels for LPG Train 4 – ZCINA project
Main Contractor: TECNIMONT
Owner: SONATRACH (ALGERIA)
Year: 2019-2020
Project: Design, Supply, Fabrication & Delivery of 14 sand filters( L: 21m, Ø:4m) for Zarat Desalination Plant
Main Contractor: WABAG
Owner: SONEDE (TUNISIA)
Year: 2019-2020
Project : Supply and Fabrication of 02 Reactors and 02 Quench Tower ( Stainless Steel SA240 TP 310 S ) ASME Stamped with ancillary equipment for Ambotovy’s Hydrogen Sulphhide (H2S) Plant
Owner : Ambotovy (MADAGASCAR)
Year : 2019-2020
Project: Manufacturing Of 8 CleanSOx Compact scrubber for EGC Unit (170K model) Material: Super Duplex
Client: Clean Marine
Year: 2018-2019
Project: Manufacturing Of 5 CleanSOx scrubber for EGC Unit (310K model) Material: Super Duplex
Client: Clean Marine
Year: 2018-2019
Project: Manufacturing Of 2 CleanSOx Compact scrubber for EGC Unit (140K model) Material :Super Duplex
Client: Clean Marine
Year: 2018-2019
Project: Manufacturing Of 1 CleanSOx Compact scrubber for EGC Unit (100K model) Material: Duplex, Super Duplex & 254 SMO
Client: Clean Marine
Year: 2018-2019
Project: Supply of 06 Scrubbers Material: 254 SMO (DeepBlueLAB SOx model)
Client: LAB
Year: 2018-2019
Project: Supply and Fabrication of monumental flagpole 60 m in belvedere – tunis
Owner: Ministere de l’equipement, l’habitat et l’amenagement du territoire (Tunisia)
Year: 2013-2014
Brochure Oil Gas
Exhaust Gas Scrubber References
Brochure Power Generation
Brochure Chemical
Project: Prefabrication and Site Erection works of 17 Skids & piping ( 93 000 ID and 8000 spools in : CS , SS , Duplex & Super Duplex ) for Nawara Gas Project . Tunisia
Mechanical equipment Erection works ( 150 equipment ) in CPF Nawara Gas Project . Tunisia .
Main Contractor: STREICHER – BOUCHAMAOUI
Owner: ETAP & OMV (Tunisia )
Year: 2017-2018
Project: Supply, Manufacturing , Delivery and Erection of 14 sand filters for Djerba desalination plant -Tunisia (Ø: 4 m; length: 24 m)
Main Contractor: Aqualia
Owner: SONEDE
Year: 2015-2016
Project: Supply and manufacturing of 02 Static Filter for Ghana
Main Contractor: AAF
Owner: GE
Year: 2015
Project: Supply and pefabrication Piping (25 000 “ ) with Paratino for power plant Sousse D
Main Contractor: Ansaldo Energia
Owner: Steg (Tunisia)
Year: 2014
Project: Technical assistance and maintenance of steel structure of the direct reduction plant at LISCO’ complex
Main contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2006
Project: Maintenance & replacement of reformer tube
Main Contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2004
Project: Maintenance of over Head cranes at LISCO
Main Contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2005
Project: Fabrication of Twin Deck Topside structure for Halk El Menzel Offshore Oilfield – Hammamet Tunisia.
Main Contractor: Topic
Owner: SAROST (TUNISIA )
Year: 2014 – 2015
Project: Supply of HP, LP, & Cryogenic Tandem Flare System for the Nawara Development Project – GTP in Gabes
Main Contractor: AEREON
Owner: ETAP & OMV (Tunisia )
Year: 2016
Project: Engineering , Supply & Manufacturing of 01 Pig Launcher Skid and 01 Pig Receiver Skid .
Main Contractor: SITEP (Tunisia )
Owner: SITEP (Tunisia )
Year: 2013
Project: Supply of Pig Traps ( 10 Pig Launcher & Pig Receiver ) for Nawara Project
Main Contractor: GIE Bouchamaoui & STREICKER
Owner: OMV
Year: 2016
Project: Engineering, Fabrication of roller tables and pushers for CCM1, CCM2
Main contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2006
Project: SMS1- Installation of Hydraulic type Turn over Cooling Bed (TOCB)
Main contractor: SOCOMENIN
Owner: Lisco-Libyan Iron & Steel Company-(Libya)
Year: 2006
Project: Supply and Fabrication of one Stack with 06 sections for Cement Plant in Liban.
Main contractor: PA Technologies (Libanon)
Owner: SOCOMENIN
Year: 2011- 2012