GMMRA (MMRA – Libya)
Project: Supply, Fabrication and Delivery of 165 tank filters 50 m3 and 54 backwash tanks 70m3 along with 1400 T of galvanized supporting steel structures.
Main contractor: Idreco S.p.a
Owner: GMMRA (MMRA – Libya)
Year: 2002
Project: Supply, Fabrication and Delivery of 165 tank filters 50 m3 and 54 backwash tanks 70m3 along with 1400 T of galvanized supporting steel structures.
Main contractor: Idreco S.p.a
Owner: GMMRA (MMRA – Libya)
Year: 2002